ACH Return to Ford Job Opportunities (Formerly known as Flow back)
The Company will be posting job openings at all ACH locations for
positions at Ford plants next week for three (3) days; Wednesday March
26th through Friday March 28th closing at 5pm.
Employees could be moving as soon as the first week in April.
Multiple openings will be posted at the same time for both Skilled
and Production employees around the plant, on the UAW Local 892
website, and through the Digital New Release. (Please sign up on the
Local 892 Website to receive the Digital News Release). You will be able
to submit your bid sheets in the Cafeteria all three days from 5am to
8:30am, 11am to 12:30pm, & 2:30pm to 4:30pm. You can also turn your bid
sheets into Labor Relations between 8am to 5pm all three days of the
sign-up window.
- Skilled Trades employees can signup to go back as either Skilled
or Production but not both.
If you will not be here to bid on a posting you will have to
get a Job Posting Permission Slip from Labor Relations to be used during
your absence. Brandon Keatts and Jodie Uroda will be the Union reps you
will be authorizing to place your desired bid (s).
Employees will be allowed to make changes during the open sign up
window period. You may change location preference, change the ranking of
location preferences, or remove your name if you have changed your mind.